Consolidating our international presence, we have manufactured and assembled the metallic structure for a liquefied natural gas tank at the Pori plant. With a diameter of 42 meters, a capacity of 30,000 m³, a weight of 280,000 kg and a height of 35 meters, we completed the project in 14 weeks, guaranteeing quality and efficiency.
Encofrado y carro
para túnel
Civil Works
Manufacture of carriage and casing formwork for tunnel construction. The whole structure is made of laminated steel quality S275Jr.
Specifications
Capacities and technical specifications of this project:
Welding
We use MMA, MIg and TIG welding techniques to guarantee solid and durable joints, adapted to the specific needs of the equipment. These welds provide us with the reliability required for lifting work, ensuring the structural integrity of the equipment at all times.
Location
Cisneros, Colombia
Duration
6 weeks