Access Shaft

Steel ductwork

Metal fabrication Metal fabrication

Fabrication of Access Shaft ducts and steelwork components in S355 J2 and S275 JR carbon steels for an industrial and energy-sector project. Supply and manufacture of Access Shaft components with a total fabricated weight of 9,804 kg, shot-blasted and finished with a zinc-rich epoxy primer, with a four-week fabrication period.

Location:
Description: Access Shaft ducts and steelwork components
Duration: 4 weeks
Description Description

Prometal manufactured Access Shaft ducts and steelwork components using S355 J2 and S275 JR carbon steels. The scope included one CS steelwork unit, one VS steelwork unit and the supply of helical pipe. Fabrication was carried out to the client's drawings using qualified welding procedures. Surface treatment comprised shot blasting to SA 2½ and application of a 100 μm zinc-rich epoxy primer, in line with project specifications. Fabrication standard: UNE-EN 1090-2 EXC2.

Specifications Specifications

Technical specifications of the project:

Servicio
Características
Sector

Materials

S355 J2 and S275 JR carbon steels

Total weight

9,804 kg

Standard

UNE-EN 1090-2 EXC2

Scope

One CS steelwork unit, one VS steelwork unit and supply of helical pipe

Finish

Shot blasting to SA 2½ and 100 μm zinc-rich epoxy primer

Duration Duration

4 weeks