Industrial building extension

Defence sector

Steel structures Steel structures

Fabrication, surface treatment and supply of 678,683.81 kg of S275JR structural steelwork for the extension of an industrial facility serving the defence sector.

Location:
Description: -
Duration: 8 weeks
Description Description

Manufacture and supply of 679 tonnes of certified structural steelwork for an industrial building extension in the defence sector, in accordance with UNE-EN 1090-2 EXC2. Prometal carried out the fabrication, surface treatment and supply of structural steelwork for the extension of an industrial building serving the defence sector. The project involved the manufacture of 678,683.81 kg of structural steelwork using S275JR hot-rolled steel sections, providing a large-scale extension designed to accommodate new production areas. The scope included preparation of fabrication and erection drawings, workshop fabrication, dimensional inspections, qualified welding procedures and delivery of structural components to site. To ensure the durability of the structure, the steelwork received a surface treatment consisting of shot blasting to SA 2½, a 75 μm Sigmafast 278 epoxy primer and a 50 μm Sigmafast 210 HS polyurethane topcoat. Fabrication was carried out in accordance with UNE-EN 1090-2, execution class EXC2, including full material traceability, weld inspections, CE marking and a complete quality dossier. The project was completed within eight weeks.

Specifications Specifications

Technical specifications of the project:

Servicio
Características
Sector

Total weight

678,683.81 kg (approx. 679 tonnes)

Material

S275JR structural steel

Standard

UNE-EN 1090-2 EXC2, including CE marking

Welding

UNE-EN ISO 3834-3

Surface treatment

Shot blasting to SA 2½, 75 μm Sigmafast 278 epoxy primer and 50 μm Sigmafast 210 HS polyurethane topcoat

Fabrication control

Material traceability, dimensional inspections, weld inspections and quality dossier

Lead time

8 weeks

Duration Duration

8 weeks